Abkons wireframes · content pack v1.3
Wireframe index
Every page in the v1.3 sitemap (data/sitemap.csv), with its template, launch status, section list, notes and the agency response. The homepage is high-fidelity; all other pages are mid-fidelity wireframes built from the same design system. Copy comes verbatim from the content pack (data/copy.json).
| Level | Page | URL | Template | Launch | Sections on the page | Notes / to confirm | Agency response v1.3 | Built |
|---|---|---|---|---|---|---|---|---|
| L0 | Homepage | / | Homepage | Launch | Hero & tagline (placeholder) · Why Abkons · Key figures · Flagship projects · What we do · Clients · Partners · Footprint map · Partner with us · FAQ · Enquiry | Project added as per internationalisation strategy - to be confirmed and/or added others | For the meeting – Noted. The Flagship projects block shows the seven International Strategy 2026 flagships in the listed order (C5); further projects can be added on agreement with management. Each card keeps a 'confirm role / client / value / permission' flag; € values only per Q12. Please confirm the seven and any additions. | — |
| L1 | What we do | /services/ | Services overview | Launch | Introduction · Environment, Social & Land · Engineering & Delivery · Advisory & Funding · How we engage · Enquiry | Group labels (C2). Groups are headings only – renaming them never breaks a URL. The dropdown lists the services under the three headings. | — | |
| L2 | Environmental & social impact assessment (ESIA) | /services/environmental-social-impact-assessment/ | Service | Launch | Introduction · What we deliver · Standards we work to · Related projects · Enquiry | Environment, Social & Land. Agreed (C3). | Done – 'Confirm (C3)' changed to 'Agreed (C3)': Abkons agreed the 14 services. No other change. | — |
| L2 | Environmental permitting & monitoring | /services/environmental-permitting-monitoring/ | Service | Launch | Introduction · What we deliver · Standards we work to · Related projects · Enquiry | Environment, Social & Land. Agreed (C3). | Done – 'Confirm (C3)' changed to 'Agreed (C3)': Abkons agreed the 14 services. No other change. | — |
| L2 | Land access & resettlement | /services/land-access-resettlement/ | Service | Launch | Introduction · What we deliver · Standards we work to · Related projects · Enquiry | Environment, Social & Land. Renamed from 'Land management'. Agreed (C3). | Done – 'Confirm (C3)' changed to 'Agreed (C3)': Abkons agreed the 14 services. No other change. | — |
| L2 | GIS & geospatial surveys | /services/gis-geospatial-surveys/ | Service | Launch | Introduction · What we deliver · Standards we work to · Related projects · Enquiry | Environment, Social & Land. Renamed from 'Geospatial information'. Agreed (C3). | Done – 'Confirm (C3)' changed to 'Agreed (C3)': Abkons agreed the 14 services. No other change. | — |
| L2 | Engineering studies & design | /services/engineering-studies-design/ | Service | Launch | Introduction · What we deliver · Standards we work to · Related projects · Enquiry | Engineering & Delivery. Agreed (C3). | Done – 'Confirm (C3)' changed to 'Agreed (C3)': Abkons agreed the 14 services. No other change. | — |
| L2 | Permitting & project management | /services/permitting-project-management/ | Service | Launch | Introduction · What we deliver · Standards we work to · Related projects · Enquiry | Engineering & Delivery. Agreed (C3). | Done – 'Confirm (C3)' changed to 'Agreed (C3)': Abkons agreed the 14 services. No other change. | — |
| L2 | Owner's engineer & supervision | /services/owners-engineer-supervision/ | Service | On confirmation (C3) Launch – on confirmation of the responsible lead (C3) |
Introduction · What we deliver · Standards we work to · Related projects · Enquiry | NEW. Engineering & Delivery. Per International Strategy 2026 deck (slide 4) – client-supplied, not seen by agency. Published once Abkons names and confirms the responsible lead (C3). | Done – Launch and note aligned with C3: page and copy (SVC-OE) are built for launch, published once the responsible lead is confirmed. For the meeting – name the lead. | — |
| L2 | EPC delivery | /services/epc-delivery/ | Service | Launch | Introduction · What we deliver · Standards we work to · Related projects · Enquiry | Engineering & Delivery. Renamed from 'Procurement and construction'. Agreed (C3). | Done – 'Confirm (C3)' changed to 'Agreed (C3)': Abkons agreed the 14 services. No other change. | — |
| L2 | Operations & maintenance | /services/operations-maintenance/ | Service | Launch | Introduction · What we deliver · Standards we work to · Related projects · Enquiry | Engineering & Delivery. Agreed (C3). | Done – 'Confirm (C3)' changed to 'Agreed (C3)': Abkons agreed the 14 services. No other change. | — |
| L2 | Engineering outsourcing | /services/engineering-outsourcing/ | Service | On confirmation (C3) Launch – on confirmation of the responsible lead (C3) |
Introduction · What we deliver · Related projects · Enquiry | NEW. Engineering & Delivery. Abkons 3.0 strategy add-on. Published once Abkons names and confirms the responsible lead (C3). | Done – Launch and note aligned with C3: page and copy (SVC-OUT) are built for launch, published once the responsible lead is confirmed. For the meeting – name the lead. | — |
| L2 | Strategy & institutional development | /services/strategy-institutional-development/ | Service | Launch | Introduction · What we deliver · Standards we work to · Related projects · Enquiry | Advisory & Funding. Merges 'Strategy and planning' and 'Organizational development'. Agreed (C3). | Done – 'Confirm (C3)' changed to 'Agreed (C3)': Abkons agreed the 14 services. No other change. | — |
| L2 | Feasibility & market studies | /services/feasibility-market-studies/ | Service | Launch | Introduction · What we deliver · Related projects · Enquiry | Advisory & Funding. Agreed (C3). | Done – 'Confirm (C3)' changed to 'Agreed (C3)': Abkons agreed the 14 services. No other change. | — |
| L2 | PPP & project structuring | /services/ppp-project-structuring/ | Service | Phase 2 (C3) Phase 2 – publish only with an approved reference project (C3) |
Introduction · What we deliver · Related projects · Enquiry | NEW. Advisory & Funding. Per International Strategy 2026 deck (slide 4) – client-supplied, not seen by agency. Published once a PPP / project-structuring reference project is approved in Map – Projects (C3). Not in the launch dropdown until then. | Done – Launch set to phase 2 per C3. Question – which project is the PPP / structuring reference? Once it is approved in Map – Projects, the page (SVC-PPP) goes live. | — |
| L2 | EU & donor funding | /services/eu-donor-funding/ | Service | Launch | Introduction · What we deliver · Standards we work to · Related projects · Enquiry | Advisory & Funding. Agreed (C3). | Done – 'Confirm (C3)' changed to 'Agreed (C3)': Abkons agreed the 14 services. No other change. | — |
| L2 | Energy | /industries/energy/ | Industry | Launch | Introduction · Our role · Selected projects · Contact | Or just leave it simply: Engineering, Development and Managment (TBC). Urban Development refered to Bishkek Project - TBC | For the meeting – We recommend keeping the five launch industry pages (Energy · Water & Waste · Transport Infrastructure · Tourism · Government & Institutions): procurement officers and IFI evaluators search and shortlist by sector, and each page carries that sector's project evidence (and ranks in search on its own). 'Engineering, Development and Management' works better as a positioning statement – e.g. hero sub-line or About opening – than as a replacement for the Industries menu; we will bring it as an option next to the C1 tagline / hero fallback. Urban Development = Green City Action Plan, Bishkek (PRJ-017) – noted in row 25; the page goes live once PRJ-017 is approved (C4). | — |
| L2 | Water & Waste | /industries/water-waste/ | Industry | Launch | Introduction · Our role · Selected projects · Contact | — | ||
| L2 | Transport Infrastructure | /industries/transport-infrastructure/ | Industry | Launch | Introduction · Our role · Selected projects · Contact | — | ||
| L2 | Urban Development | /industries/urban-development/ | Industry | Phase 2 (C4) Phase 2 – go live once a reference project is approved (C4) |
Introduction · Our role · Selected projects · Contact | Done – Launch aligned with C4: not in the launch menu. Reference project: Green City Action Plan, Bishkek (PRJ-017) – pending approval (per Abkons note I22). Page and copy (IND-URB) are ready; published and added to the Industries menu once PRJ-017 is approved. (Notes column I22:I28 is one merged cell holding Abkons's note, so the agency note sits here.) | — | |
| L2 | Agriculture | /industries/agriculture/ | Industry | Phase 2 (C4) Phase 2 – go live once a reference project is approved (C4) |
Introduction · Our role · Selected projects · Contact | Done – Launch aligned with C4: not in the launch menu. Reference project: Forest and pasture management plans, Albania (Abkons-supplied in IND-AGR-03; to be added to Map – Projects as PRJ-018, unverified) – pending approval. Page and copy (IND-AGR) are ready; published and added to the Industries menu once PRJ-018 is approved. | — | |
| L2 | Tourism | /industries/tourism/ | Industry | Launch | Introduction · Our role · Selected projects · Contact | — | ||
| L2 | Government & Institutions | /industries/government-institutions/ | Industry | Launch | Introduction · Our role · Selected projects · Contact | — | ||
| L1 | Projects | /projects/ | Project portfolio | Launch | Introduction · Filters · Project cards · Pagination | New filters: Funder, Role. | — | |
| L2 | Project case study (one page per approved project) | /projects/river-basin-management-kosovo/ pattern /projects/[project-name] |
Case study | Launch | Facts panel · Challenge · Approach · Outcomes · People & community · Gallery · Project reference sheet (PDF) · Enquiry | First: /projects/river-basin-management-kosovo (template). Then the seven flagship projects (C5). | — | |
| L1 | Partner with us | /partners/ | Partners | Launch | Hero · Who we partner with · Partnership models · Scopes we deliver · How we start · Credentials · Markets in focus (optional) · Pre-qualification pack · Business Development contact | NEW. Core page of the International Strategy 2026 (client-supplied deck, not seen by agency). Contact = Business Development via info@abkons.com (C12). Markets in focus: target regions shown on this page only (C10 agreed). | Done – 'International Division contact' → 'Business Development contact' (C12); note updated with C12 routing and C10. Content matrix row 53 and Copy proposal PTN section must match. | — |
| L1 | Blog | /blog/ | Blog listing | Launch | Introduction · Filter tabs (All · News · Insights · Photos & videos) · Article summaries · Follow us · Pagination | menu label 'Blog' on every page (C8). 'Follow us' links to LinkedIn, Facebook and Instagram. | — | |
| L2 | Blog article (one page per post) | /blog/durres-prishtina-railway-feasibility-study/ pattern /blog/[article-name] |
Blog article | Launch | Headline & intro · Byline · Body · Photos & video · Related work · FAQ | First: Durrës–Prishtina railway study post. Every post ends with an FAQ (C9). | Proposed – Posts, the Insights listing and Photos & videos share /blog/…: the slugs 'insights' and 'photos-videos' are reserved and cannot be used for a post. Naming: Sitemap says 'Blog article'; Content matrix and Copy proposal say 'News article' / 'News post' – same template. | — |
| L2 | Insights | /blog/insights/ | Insights listing | Launch | Introduction · Insight summaries · Pagination | — | ||
| L3 | Insight article (one page per insight) | /blog/insights/connecting-technical-assessment-with-local-knowledge/ pattern /blog/insights/[article-name] |
Insight article | Launch | Headline & intro · Byline · Body · Photos & video · Expert perspective · Related work · FAQ | First: river basin planning insight. Every insight ends with an FAQ (C9). | — | |
| L2 | Photos & videos | /blog/photos-videos/ | Media gallery | Launch | Introduction · Albums · Videos · Follow us | Abkons has no YouTube channel: videos are uploaded to and played from the website (MP4 with captions and a poster image). Photos and videos open in a viewer – no separate page per item. | — | |
| L1 | About | /about/ | About | Launch | Company · Know. Connect. Build. · People & community | Why Abkons, Key figures and the footprint map are no longer repeated here – they appear once, on the homepage. | — | |
| L2 | Quality & compliance | /about/quality-compliance/ | Credentials | Launch | Introduction · Certified management systems · Licences · Standards we work to · Policies · Downloads | TO BE CONFIRMED: Certificate numbers, bodies, validity dates and policies from Abkons (C15). | — | |
| L2 | People | /about/people/ | People | Phase 2 (Q1 2027) Phase 2 (Q1 2027) |
Introduction · Leadership · Key experts | MANAGMENT VS TECHNICAL EXPERTS -TBC Approved bios and consent needed. | Done – Management and technical experts are already two separate sections: Leadership (PPL-02) and Key experts (PPL-03). Page stays phase 2 (Q1 2027). Needed from Abkons: names per section, approved bios and photos with signed consent (C7). For the meeting – who counts as Leadership. | — |
| L2 | Careers | /careers/ | Careers listing | Launch | Working here · Vacancies · Application guidance | Moved from the main menu into About (URL unchanged). | — | |
| L3 | Vacancy (one page per live role) | /careers/lead-design-renewable-energy-unit/ pattern /careers/[role-name] |
Vacancy | When roles are live | Role facts · Responsibilities · Requirements · How to apply | HR supplies live vacancies (C7). | — | |
| L1 | Contact | /contact/ | Contact | Launch | Contact routing · Form & consent · Offices | As per country or just one main adress - linked to busness developemnt - to be confirmed | Done (C12) – One main address: info@abkons.com, routed to Business Development (partners@ may follow later). No per-country contact. The Offices block lists Tirana (HQ), Prishtina and Skopje from Map – Offices (Belgrade only if confirmed active – Q1). Question – may the Contact page show the street addresses already public on abkons.com? The map shows country only (Q5). | — |
| L1 | Privacy notice | /privacy/ | Privacy | Launch | Privacy notice · Analytics choice | Until the full notice is issued, the current abkons.com Privacy Policy stays in use – agency migrates the text, Abkons confirms (C7). Full notice later from Abkons' privacy owner. | Done – C7: the current Privacy Policy and Terms of Use stay in use. abkons.com has a 'Terms of Use' page today, so the new site needs a Terms of Use page: proposed /terms, Legal page template, Footer, Launch, migrated from the current website. Not added as a row here so the navigation block (rows 47–50) keeps its row numbers; it is listed in the footer (I49). Content matrix #98 and Copy proposal LEG-01 now cover the Terms of Use page (QA 21 Oct). | — |
| L1 | Accessibility statement | /accessibility/ | Accessibility | Launch | Accessibility statement | NEW. | Done – tree glyph only ('└─' → '├─'), because Code of Conduct now follows. | — |
| L1 | Code of Conduct | /code-of-conduct/ | Legal page | Launch | Code of Conduct · Download (PDF) | NEW. - from the current website | Done – Row completed: /code-of-conduct, Legal page, Footer. Agency migrates it from the current website (Abkons_Code_of_conduct_2021.pdf; English only – C14). Also linked from Quality & compliance › Policies (QLT-05). Question – is the 2021 version still current? | — |
| L1 | Terms of Use | /terms/ | Legal page | Launch | Terms of Use | Not a row in sitemap.csv – proposed in the agency response to row 43 (C7) and listed in the footer (Legal). | — | |
| — | Wireframe index | /wireframes/ | Wireframe index | Review only | Page list from data/sitemap.csv | Not part of the live site. Generated by tools/build-wireframes-index.mjs. | — | |
| — | Not found | /404.html | Not found | Launch | Message · Links back | Served by Caddy for any unknown URL (real 404 status). | — |
Navigation (v1.3)
Main menu — What we do ▾ · Industries ▾ · Projects · Partner with us · Blog · About ▾ · Contact (button)
What we do ▾: Environment, Social & Land · Engineering & Delivery · Advisory & Funding (14 services; Owner's engineer & supervision and Engineering outsourcing on confirmation of the lead, PPP & project structuring phase 2 – C3)
Industries ▾: Energy · Water & Waste · Transport Infrastructure · Tourism · Government & Institutions (Urban Development, Agriculture: phase 2 – C4)
Blog: News · Insights · Photos & videos
About ▾: Quality & compliance · People (phase 2) · Careers
Footer — Offices · Company · Legal · Follow us · © Abkons
Offices: Tirana (HQ) · Prishtina · Skopje
Company: Quality & compliance · Careers
Legal: Privacy notice · Terms of Use · Accessibility statement · Code of Conduct · Analytics preferences
Follow us: LinkedIn · Facebook · Instagram
The interactive footprint map appears on the Homepage only.